New hotel construction projects: to ensure that nothing goes wrong on your vacation

Impernor Asbitra works in different Spanish hotels so that nothing fails in your vacations. In this post we show you some of them
Published on
23 May 2018

Summer vacations are approaching and most people are already imagining the sand under their feet, the sun's rays tanning their bodies and the sound of the sea in the background as a soundtrack. Movie-like, isn't it?We know that the concept of "idyllic vacations" is at odds with poorly soundproofed hotel rooms or with rooms that do not respect the optimal temperature conditions for the welfare and comfort of people. That is why, so that nothing fails in your future vacations, we are currently working in the hotel division, with works such as Atalaya Park Golf Hotel & Resort, Hotel Ibis and Only YOU Hotel Atocha.

To find the north sometimes you have to travel to the south

A frenetic and stressful lifestyle can sometimes make individual goals get lost in the horizon, in an unknown direction where individuals feel dislocated, lost. Is this your situation? Then take hold of the maxim "to find the north you have to travel south" and travel to Atalaya Park Golf Hotel & Resort in Estepona (Malaga). The reform of this complex, located on the beachfront along the beach between Marbella and Estepona, is among our recent works thanks to the confidence that has returned to Impernor Asbitra our client Avintia Proyectos y Construcciones. This project is unique because all the work has to be done before the opening of the vacation season. Reason why they have come to us, being aware of our professionalism, both in terms of personnel and maneuverability. The work to be done is approximately 7,000 m² of waterproofing, of which 2,300 m² are carried out on an inverted roof with a filter slab finish, while the rest of the work is done on a traditional roof where the waterproofing finish has to be impeccable.

Madrid, a summer oasis

On the other hand, in Madrid, we continue to develop our work at the Ibis Hotel. For this, our regular client Construcciones Acr, S.A. has once again entrusted its waterproofing work to our company. This property corresponds to Hotel Restructuring Investment Management, S.L. for which the architect has worked in its facultative and technical direction Urbex Arquitectura, S.L.P. Within our latest works there is also Only YOU Hotel Atocha for which we provide our services directly for El Corte Inglés. Other hotels in which we work are: Hotel Meliá Avda. de América (Madrid) and Hotel Príncipe Felipe "Los Belones " (Murcia).

No items found.
No items found.
Related news
Architecture

The oldest operating factories

What does a factory's ability to stay in production depend on today? Design and construction, preventive maintenance, up-to-date technology, adaptation to market demands, efficient management? Aspects that, for the most part and within their historical context, were surely also shared in their beginnings by the longest-lived factories in the world that still maintain their original activity.
Projects

How the pedestrianization of the Gran Vía project affects pollution in downtown Madrid

Last March 2020 began the works for the pedestrianization of Gran Vía. A project for which, finally, has opted for: sidewalks differentiated from the road, for safety reasons; not including a bike lane, there will only be in the Plaza de España - Callao section; and 248 trees that, along with street furniture, will have a dual function of safety and comfort for citizens.