Toledo University Hospital

Hospital projectsView site

The new Toledo Hospital is one of the most ambitious projects in the health sector in Spain. Designed by árgola arquitectos and built by Acciona, OHL and Dragados, this colossal project has a budget of more than 204 million euros. Impernor Asbitra y Asociados S.L. has been the company in charge of executing the waterproofing and insulation phase of the complex. With a total surface area of 350,888 square meters, the hospital incorporates important improvements, such as a 21% increase in the number of beds and a 50% increase in the number of operating rooms. The health center, equipped with the most modern technologies and circuits designed to achieve high levels of efficiency and performance, will be inaugurated in 2019 and promises to be a benchmark in the healthcare sector.

The new Toledo Hospital project was signed in April 2017 by árgola arquitectos and the joint venture formed by our clients Acciona, S.A., OHL, S.A. and Dragados, S.A., who have entrusted Impernor Asbitra y Asociados S.L. to execute the waterproofing and insulation phase of the complex.

The new hospital in the La Mancha city will be inaugurated in 2019. At present, the projected parking lots have been completed on its three below-ground levels and the façade enclosures of the hospitalization buildings have begun, among other works.

The plot on which the new Toledo Hospital is to be built is rectangular in shape and has a total surface area of 350,888 square meters. This colossal project has a budget of more than 204 million euros, to which must be added the fifty million euros that the regional government will allocate to equip the hospital with the most modern technologies and circuits designed to achieve high levels of efficiency and performance.

In addition, this new health center incorporates important improvements not contemplated in the previous Functional Plan, including an increase of more than 21% in the number of beds and a 50% increase in the number of operating rooms. When its construction is completed, the number of ICU Pediatric and Neonatal units will also be increased, from six to ten units and from eight to ten units, respectively.

Customer

UTE (Acciona, S.A., OHL, S.A. and Dragados, S.A.)

Location

Toledo, Castilla La Mancha. Spain

Year of construction

2019

Services

73.700 m2. - lightened concrete.

73.700 m2. - waterproofing of walkable technical roofs, parking lots and landscaped areas.

102,540 m2 - geotextile felts and separating layers.

30.000 m2. - thermal insulation.

4,000 m2 - draining sheets.

1,500 m2 - filtering slabs.

Materials

Asphalt sheets.
Geotextile felts (polyester and polypropylene).
Thermal insulation (xps).
Drainage sheets (pead).
Filtering slabs with insulating base.

Share on