Contribution to energy efficiency in urban hotels

IMPERNOR ASBITRA contributes to the energy efficiency of urban hotels through its specialties, waterproofing and insulation.
Published on
17 Dec 2018

With Christmas just around the corner, many of us are already thinking about returning to the city where we were born, reuniting with that special person in that almost magical place or sharing a special moment with our family in one of the best urban destinations. In short, we think about traveling to other cities, but we also think about our comfort and the well-being of the important people around us. Fundamental things, invisible to the eye, which are the essence of Impernor and Asbitra Asociados, S.L. in their hotel projects. Even if you don't see us, we are always there for your protection: thermal, acoustic and climatic.

We shelter buildings to protect the most important thing: people.

In Impernor y Asbitra Asociados, S.L. we know that in order to preserve the maximum conditions of well-being and comfort inside a building it is essential to work directly on its skin: roof, facades or floor. Therefore, through the installation of the best insulation systems we help our clients to reduce the main thermal losses that occur in the building envelope, maximizing the energy efficiency of different hotels. Through this work we prevent the operator of the complex from incurring unnecessary expenses and, in addition, we get closer to the commitments and obligations set by the European Union for 2020: near-zero consumption buildings.

Currently, thanks to our extensive experience in the rehabilitation of sustainable hotels, we are currently executing these services together with our client Construcciones San Martín in the HOTEL PESTANA CR7 MADRID LIFESTYLE HOTEL, which will be inaugurated in early 2019 at 29 Gran Vía Street.

No items found.

Environmentally friendly hotels trust in Impernor Asbitra

Today, hotel complexes are increasingly expanding their energy efforts. This is because a large part of their bill comes from the costs associated with air conditioning. And, in addition to the economic consequences, this energy waste also has an impact on the environment, since energy production and use is responsible for most of the CO2 emissions caused. A reality that hotel customers are increasingly aware of and that Impernor and Asbitra Asociados, S.L. are fighting to preserve: GOOD ON THE INSIDE. Therefore, we are proud to have worked with our clients in projects that respect the environment and the welfare of people. These maxims are notorious characteristics, for example, in ONLY YOU BOUTIQUE HOTEL(Hoteles Ayre), HOTEL REX (Acciona Construcción), HOTEL IBIS(ACR Construcciones) or THE HAT(F.C.C. Construcción).

Impernor Asbitra is responsible for that comfort that can neither be seen nor heard.

Two of the features most valued by customers when choosing a hotel to stay at are the condition of the facilities and the services it offers. But there are also other invisible factors that affect user satisfaction. A comfort that is neither seen nor heard, but felt, thanks to the work we have also carried out in hotels such as EXE MONCLOA (DUMIPAL XXI), HOTEL VILLA DE ALCOBENDAS (UVE HOTELES) or HOTEL ONLY YOU(El Corte Inglés).

In Impernor y Asbitra Asociados, S.L. we offer our customers the highest levels of quality in our insulation and waterproofing installations, to ensure maximum comfort inside them. Why? Because your success is our success. Because the well-being of your customers is also our satisfaction. Because protecting the environment is also our eco-commitment.

No items found.
Related news
Projects

A new concept of mid-stay hotels

Our hotel division is one of the most relevant categories for the company. From luxury and Grand Luxury hotels in the best locations, to the rehabilitation of legendary hotels that are icons of our country, to the most innovative and flexible concepts.
Projects

Ipurúa Stadium refurbishment 2019

We are working on the remodeling of the Ipurúa Stadium in Eibar and the waterproofing of the West stand and the remodeling of the South stand are being carried out. The remodeling of the stadium is being carried out in five phases and the first two have already been completed. The third phase is focused on the new West Stand and the remodeling of the South Stand.